Door Installation Step 2

Door Installation


 
2.1 A 1/4" ball-end allen screw should be pre-installed on the bottom of the lower cam. If it is not, screw it into the hole opposite the "V" allowing it to protrude about 1/4". Also check to see that the set screw on the upper can is securely tightened.
2.2 Hold the door in the doorway in a partially opened position and tilt it downward slightly to face the floor while sliding the lower shaft into the jamb guard hole.
2.3  Hold the lower cam up against the upper cam and guide the shaft into the upper bracket. Seat the lower cam upon the bracket being sure the screw enters the small slot in the bracket and that the remaining holes in the cam align with the holes in the bracket.
2.4 Secure the cam to the bracket by inserting and tightening the remaining two ball end screws.

Next Step 33arrow.gif (108 bytes)

StoreFront Main Menu  

Home ] Up ]
Send mail to webmaster@rubbair.com with questions or comments about this web site.
Copyright © 1999 RubbAir Door, Inc.
Last modified: June 23, 2004
logobottom.GIF (7021 bytes)