3arrow.GIF (843 bytes)Home
  3arrow.GIF (843 bytes)Doors
  3arrow.GIF (843 bytes)Specs
  3arrow.GIF (843 bytes)Tech
  3arrow.GIF (843 bytes)Contact Us 
1ptrans.gif (44 bytes)
Install Step 1
Install Step 2
Install Step 3
Install Step 4

Door Installation Step 1

Doorway Preparation

step1.gif (98874 bytes)

  1. Inspect. If carton or doors are damaged from shipping (bent shaft, etc.) contact the factory
  2. Check jamb and header for plumb, level and square (measure diagonals).
  3. Match size of door opening to size on packing slip.
  4. Mark center plumb line on jamb.
  5. Tape the template supplied with these instruction to jamb. Template center line must line up with your plumb line (see detail). Adjust template height if header is not level.
  6. Mark top cam hole center on jamb with center punch. Do the same for the bottom bearing. See instructions on template. If jamb guards are included, use jamb guard as template to mark holes.
  7. Drill all holes with 5/16" bit and tap with 3/8-16NC tap.

placement.gif (46483 bytes)Next Step 23arrow.gif (108 bytes)

StoreFront Main Menu  

Home ] Up ]
Send mail to webmaster@rubbair.com with questions or comments about this web site.
Copyright © 1999 RubbAir Door, Inc.
Last modified: May 04, 2003
logobottom.GIF (7021 bytes)